    When archaeologists or other peopleexcavatea piece of land, they remove earth carefully from it and look for things such as pots, bones, or buildings which are buried there, in order to discover information about the past.
    1. A new Danish expedition is again excavating the site in annual summer digs.
      一支新的丹麦探险队又在那个遗址上进行一年一度的夏季挖掘。
  • VERB 挖;开凿
    Toexcavatemeans to dig a hole in the ground, for example in order to build there.
    1. A contractor was hired to drain the reservoir and to excavate soil from one area for replacement with clay.
      雇了一个承包商抽干水库的水,挖掉一个区域的泥土后再用黏土填上。

双语例句

  • Are archeological excavations ongoing in a part of the city.
    考古发掘是在这个城市的一个组成部分进行。
  • Excavations have revealed Roman and Anglo-Saxon remains in the area.
    挖掘工作已显示在该地区有罗马和盎格鲁-撒克逊时代的遗迹。
  • These have always'been believed to have once formed part of Atlantis although it appears that little further excavations or explorations have ever taken place on this site.
    这些总是被认为曾经形成了亚特兰提斯的一部份,虽然似乎曾经在这个地方有更进一步的挖掘或探险。
  • Finite element analysis of the deformation of deep excavations considering time-space effect in soft soils
    考虑时空效应的软土深基坑变形有限元分析
  • Further excavations had to wait until the following year.
    进一步的挖掘只得等到来年进行了。
  • Information processing and compilation of report on archaeological excavations should be completed within three years upon completion of the excavation projects of the archaeological excavation units.
    考古发掘单位的发掘项目结束后,要在3年内完成资料整理和考古发掘报告编写一工作。
  • It was found during excavations in an ancient sewer in one of the oldest parts of the city.
    这个金铃铛是在发觉耶路撒冷旧城最古老的地区一个古老的裁缝店时发现的。
  • The design of braced excavations in soft clays is usually controlled by the short-term undrained stability.
    软黏土中深基坑开挖支护系统设计一般由不排水稳定控制。
  • By the numerical analysis, its advantages such as small displacements and application to super-deep excavations are investigated.
    通过数值分析,体现了该技术在严格控制基坑变形、超深基坑支护方面具有明显的优越性。
  • Dewatering systems shall provide dry, stable conditions for subsequent operations within the excavations.
    在开挖现场中,降水系统应为后续操作提供干燥、稳定的环境。